Sumários
Part#1 - Chapter#3
13 outubro 2017, 08:00 • Rui Castro
Economic assessment of projects: Internal rate of return (IRR). Solution of the non linear equation by Gauss method. Problem 2 - end. Generating system production cost: Computation of the number of hours, installed capacity, energy produced and total system costs so that the total system production cost is minimal. Traditional regulation.
CUSTOS NOS SISTEMAS DE POTÊNCIA
11 outubro 2017, 14:00 • João José Esteves Santana
CUSTOS NOS SISTEMAS DE POTÊNCIA
PRODUÇÃO
custos versus preços numa situação não equilibrada de mercado
O mercado Ibérico
Part#1 - Chapter#3
9 outubro 2017, 17:30 • Rui Castro
Chapter 3 - Costs in power systems. Power station production cost. Discount rate and annuity. Levelized Cost of Energy (LCOE) and marginal cost. Economic assessment of projects. Net Present Value (NPV).