Sumários

Part#1 - Chapter#3

13 outubro 2017, 08:00 Rui Castro

Economic assessment of projects: Internal rate of return (IRR). Solution of the non linear equation by Gauss method. Problem 2 - end. Generating system production cost: Computation of the number of hours, installed capacity, energy produced and total system costs so that the total system production cost is minimal. Traditional regulation. 


P#3

12 outubro 2017, 08:00 Rui Castro

Problem 3 - Technology adoption and system cost.


CUSTOS NOS SISTEMAS DE POTÊNCIA

11 outubro 2017, 14:00 João José Esteves Santana

CUSTOS NOS SISTEMAS DE POTÊNCIA
PRODUÇÃO
custos versus preços numa situação não equilibrada de mercado
O mercado Ibérico


PROBLEMA 1

10 outubro 2017, 11:00 João José Esteves Santana

PROBLEMA 1


Part#1 - Chapter#3

9 outubro 2017, 17:30 Rui Castro

Chapter 3 - Costs in power systems. Power station production cost. Discount rate and annuity. Levelized Cost of Energy (LCOE) and marginal cost. Economic assessment of projects. Net Present Value (NPV).