Part#1 - Chapter#3

23 outubro 2017, 17:30 Rui Castro

Transmission costs. Transmission network development plan. Cost structure and tariff periods. N-1 security criterion. Interconnection with other transmission networks. Transmission network statistics. Indicative equipment prices for the transmission network. Why is the power system three-phase? Why AC? Time evolution of the electrical quantities. Complex amplitude. RMS value and phase angle.


Problema 4

23 outubro 2017, 17:00 João José Esteves Santana

Problema 4


CUSTOS DE DISTRIBUIÇÃO

23 outubro 2017, 15:30 João José Esteves Santana

CUSTOS DE DISTRIBUIÇÃO
Desenvolvimento económico das redes de distribuição.
Custos de capacidade.
Energia reactiva.
Custos dos equipamentos da redes de distribuição.


Part#1 - Chapter#3

20 outubro 2017, 08:00 Rui Castro

The Iberian Electricity Market (MIBEL). Market Splitting. Intraday market. Futures market. Bilateral contracts. Risk in generation costs.


P#4 and P#5

19 outubro 2017, 08:00 Rui Castro

Problem 4 – MARKET-BASED COST RECOVERY IN THE BALANCED SYSTEM. 

Problem 5 – MARKET-BASED COST RECOVERY IN AN UNBALANCED SYSTEM.