Metallic Liquid walls for plasma reactors - LMwalls
FCT - PTDC/FIS-PLA/31629/2017
Duration: 36 months: : 01/10/2018 - 30/09/2020
Total Funding:: 231.000 ?
PI: R. Mateus (IPFN - IST)
Coordinator CeFEMA: A.C. Ferro (Funding: 32.500 ?)

Eco-efficient hydraulic binders produced from waste cement-based materials
FCT - PTDC/ECI-CON/28308/2017
Duration: 36 months: 01/10/2018 - 30/09/2020
Total Funding: 228.000 ?
PI: J.A. Bogas (CERIS - IST); Co-PI: A. Guedes (CeFEMA)
CeFEMA team member.

POSTEJO 4.0: Inovação para a Diversificação e a Exportação.
SISTEMA DE INCENTIVOS À INVESTIGAÇÃO E DESENVOLVIMENTO TECNOLÓGICO (SI I&DT)
AVISO Nº 03/SI/2017 - PROJETOS EM CO-PROMOÇÃO ? Programa interface.
PI: POSTEJO-PRE-FABRICADOS DE CIMENTO S.A.
Duration: 36 months: 01/06/2018 ? 31/05/2021
Global Value : 900.000 ?; Funding 450.000 ?
IST team member: A.C.Ferro
(Value IST: 135750 ?; IST funding: 54.300 ?).

Tantalum Capacitors with low ESR values
PhD industrial research project under the IST/EPCOS protocol (2003-08)
FCT Scholarship
Coordination: Alberto Cabral Ferro
Funding: 50 000 ?

Functional gradient Aluminium matrix composites produced by centrifugal casting
Praxis/P/CTM/12301/98.
Partner, Coordination IST: Alberto Cabral Ferro
Funding: 7 700 ?

Glass ceramic matrix laminated composites reinforced by continuous fibres: the LAS+Si3N4/SiC and LAS+SiC/SiC systems
PBIC/C/CTM/1893/95
Coordination: Alberto Cabral Ferro
Funding: 33 300 ?

Copper Alloys hardened by dispersion and precipitation
PBIC/C/CTM/1382/92.
Partner, Coordination IST: Alberto Cabral Ferro
Funding: 13 000 ?