Lab 6B
11 dezembro 2018, 14:30 • Maria José Resende
Testing the three phase induction machine; no load test, blocked test and resistive load test.
11 dezembro 2018, 14:30 • Maria José Resende
Testing the three phase induction machine; no load test, blocked test and resistive load test.