Lab 6B
12 dezembro 2018, 10:30 • Maria José Resende
Testing the three phase induction machine; no load test, blocked test and resistive load test.
12 dezembro 2018, 10:30 • Maria José Resende
Testing the three phase induction machine; no load test, blocked test and resistive load test.