Sumários

Reviews

15 dezembro 2016, 11:00 Luis Marcelino Ferreira

Questions

Should DY transformers be considered as phase-shifters?

Role of DY and role of phase-shifters

Os transformadores DY devem ser considerados como phase-shifters?

The clock hour for phase-shift representation in DY, YY, and DD transformers

Resolution of part of a past exam, 18Jan13

Circuit compensation for contingency analysis


HVDC links

13 dezembro 2016, 09:30 Luis Marcelino Ferreira

Why DC links

Advantages and disadvantages

Losses, transmission capacity, induction and capacitance of transmission lines and cables

Conversion stations (rectification and inversion)

Figures for the rectification inversion process

Valves and thyristors

Firing angles: alpha and gamma

Structure of the stations: multiple transformers, large inductors and capacitors, filters

High voltage and high power

Circuit model of a HVDC link: controlled-voltage sources and resistances

Resistance at commutation

Voltage sources controlled by alpha, gamma, and transformer taps


Problem9 and Problem10

13 dezembro 2016, 08:00 Luis Marcelino Ferreira

Discussion of Problem9

Step by step solution, following code

Numerical results

Drawings of phasor diagrams

Complete voltage phasor diagrams, with 12 voltage phasors

Discussion

Presentation and discussion for Problem10


Test2

6 dezembro 2016, 17:00 Luis Marcelino Ferreira

Test2 -- Short-Circuits and State Estimation


Reviews and Problem11

6 dezembro 2016, 09:30 Luis Marcelino Ferreira

Reviewing of critical aspects of unsymmetrical faults

Problem11

Review of state estimation problem

Identify the state

Identify the function

Run optimization

Compute the objective

Interpret the results