Sumários
Assignment #1a development
15 março 2019, 09:30 • Lis Mara Rocha Silva
Description of the Assignment #1a
Subsea Engineering III
14 março 2019, 15:00 • Lis Mara Rocha Silva
Subsea Structures and Equipment: Subsea Wellhead, Subsea Xmas Trees (Vertical and Horizontal) and Subsea Separation and Processing (Gas/Liquid and Water/Hydrocarbon).
Subsea Engineering II
12 março 2019, 15:00 • Carlos Guedes Soares
Subsea Structures and Equipment: Subsea Manifold, Pipeline End Manifold (PLEM), Pipeline End Termination (PLET).
Introduction of Assignment #1a
8 março 2019, 10:30 • Lis Mara Rocha Silva
A technical feasibility study to develop an offshore oil production system.
Introduction of Assignment #1a
8 março 2019, 09:30 • Lis Mara Rocha Silva
Description of the Assignment #1