Sumários

Assignment #1a development

15 março 2019, 09:30 Lis Mara Rocha Silva

Description of the Assignment #1a


Subsea Engineering III

14 março 2019, 15:00 Lis Mara Rocha Silva

Subsea Structures and Equipment: Subsea Wellhead, Subsea Xmas Trees (Vertical and Horizontal) and Subsea Separation and Processing (Gas/Liquid and Water/Hydrocarbon). 


Subsea Engineering II

12 março 2019, 15:00 Carlos Guedes Soares

Subsea Structures and Equipment: Subsea Manifold, Pipeline End Manifold (PLEM), Pipeline End Termination (PLET).


Introduction of Assignment #1a

8 março 2019, 10:30 Lis Mara Rocha Silva

A technical feasibility study to develop an offshore oil production system.


Introduction of Assignment #1a

8 março 2019, 09:30 Lis Mara Rocha Silva

Description of the Assignment #1