Projects Distribution

 Teams  / Project link

 

 Group 1   and  Group 12

    -  Project 1 

 Group 2    and Group 11

    -  Project 2

 Group 3   and Group 10

    - Project 3

 Group 4   and Group 9

    - Project 4_mod

 Group 5   and Group 8

    - Project 5

 Group 6    and Group 7

    - Project 6


1. Develop the Synthesis of the  Industrial Process in accordance with the objectives and specifications listed above and applying the Douglas methodology.

2. Indicate on each Douglas level which io the range of optimal values for design variables and their annual EP.

Presentation and Reporting:

March, 29  - First Presentation (Levels 1 to 3) - Submission in fenix of Power Point ( with some notes) and Excel until March, 28.

May, 3 - Second Presentation (Level 4) - Submission in fenix of Power Point (with some notes) and Excel until May, 2.

May, 31 - Third Presentation ( Level 5) - Submission in  fenix of Power Point (with some notes) and Excel until May, 30.

Final Report  to be uploaded at fenix until June, 17, 11 pm)-  Excel file well organized with notes/comments required for the proper understanding of the main results of the Project.