L0 - Lab Introduction

Introductory design to introduce the students to the design tools and to the development boards to be used in the labs.

P1 - Project 1

The project should be carried out in the classes of October 3rd to 12th.
The design must be demonstrated at the latest during the week of October 15th (week of October 22th, for the Friday groups).
The report must be delivered via fenix, along with all project files (* .vhd * .xdc).

P2 - Project 2

The project should be carried out in the classes of October 17th to November 9th.
The design must be demonstrated at the latest during the week of November 12th.
The report must be delivered via fenix, along with all project files (* .vhd * .xdc).

P3 - Project 3

The project should be carried out in the classes of November 14th to December 14th.
The design should be demonstrated at the latest during the week of December 17th.
The report must be delivered via fenix, along with all project files (* .vhd * .xdc).