Anúncios
Final marks
14 fevereiro 2019, 09:49 • Luís Filipe Moreira Mendes
. The final marks are now available.
Marks after repetition tests
12 fevereiro 2019, 13:00 • Luís Filipe Moreira Mendes
. In the MARKS section you can find all the grades except the final project; the grades are out of 12 (final project is graded to 8).
Final project deadline - February 8th
3 fevereiro 2019, 21:21 • Carlos Augusto Santos Silva
Dear all,
Final project - session to clarify questions: THURSDAY 24th 2019, at 10H
23 janeiro 2019, 09:23 • Carlos Augusto Santos Silva
Dear all,
for those of you who have questions about the final project, please meet me tomorrow between 10 and 11H30 in my office (IN+, Mecanica II building, 2st floor), see the map (room 2.24)
https://www.google.com/maps/place/IDMEC+%E2%80%93+Instituto+de+Engenharia+Mec%C3%A2nica+(P%C3%B3lo+IST)/@38.7374971,-9.1374773,21z/data=!3m1!5s0xd1933a3a420f52f:0xe4413987cc20ccb5!4m12!1m6!3m5!1s0xd1933823b37586d:0x2e72702f5aa5f58f!2sGoogle!8m2!3d38.7188872!4d-9.1437807!3m4!1s0x0:0xa101149358dc9b57!8m2!3d38.737496!4d-9.1373406
FINAL Project
18 dezembro 2018, 10:46 • Carlos Augusto Santos Silva
Dear all,
Here is detailed information regarding the final project, in particular to clarify the objective, the scope and requirements of the final report.
1 - The projects have to be in groups of two
2 - The objective of the project is to design a solar thermal system for a any application you want, using the design tool POLYSUN. Examples of possible projects are: domestic hot water supply for a house, domestic hot water and space heating, or even domestic hot water and pool heating. Single houses or multifamily houses projects are acceptable.
3 - The project consists of a report (up to 5 pages) where the following elements must be presents
A - System location and requirements
B - Technical solution description and justification
C - Technical and financial analysis
D - Sensitivity analysis of most critical parameters (including identification of these parameters)
E - Optimized solution of the system, with discussion
4 - The report should be delivered by email (PDF file), together with the Polysun file of the project.
5 - The project will be evaluated according to the following criteria:
A - Adequacy of the technical solution: 30%
B - Robustness of the solution based on the sensitivity analysis: 30%
C - Quality of Report: 40%
6 - The projects need to be delivered until the second exame date (5.2). Oral discussions may be required to clarify the report.
I wish you all the best
Carlos Silva