Sumários
NÃO HOUVE AULA: COST MEETING
21 março 2012, 09:30 • João Miguel da Costa Sousa
NÃO HOUVE AULA: COST MEETING
NÃO HOUVE AULA: COST MEETING
19 março 2012, 14:00 • João Miguel da Costa Sousa
NÃO HOUVE AULA: COST MEETING
Lot scheduling: rotation schedules with parallel machines. Introduction to supply chain management.
14 março 2012, 09:30 • João Miguel da Costa Sousa
Lot scheduling: rotation schedules with parallel machines. Introduction to supply chain management.
Economic Lot Scheduling. One type of item / one machine. Several types of items / one machine.
12 março 2012, 14:00 • João Miguel da Costa Sousa
Economic Lot Scheduling. One type of item / one machine. Several types of items / one machine.
Flexible flow shop. Flexible Flow Line loading algorithm, Dynamic balancing heuristic. Example at Toyota.
7 março 2012, 09:30 • João Miguel da Costa Sousa
Flexible flow shop. Flexible Flow Line loading algorithm, Dynamic balancing heuristic. Example at Toyota.